4 ms·
And from the engineer's perspective the frustration is: We're so busy lifting blocks on top of blocks, that we don't have time to come up with better tools to d
by bcoughlan 7y ago
And from the engineer's perspective the frustration is: We're so busy lifting blocks on top of blocks, that we don't have time to come up with better tools to do it faster. Also some of the blocks are triangles and this pyramid is 5x bigger than the last one and will probably collapse if not re-designed. The slaves are exhausted because they just finished working overtime to build the last pyramid you wanted, and in a given work day, half of them are working on patching up the other crumbling pyramids we built.
But the only metric the manager cares about is how many blocks per week we're pumping out. And that's why we'll never get along...