5 ms·
It sure doesn't look good to have two software issues very late in the product development cycle, on a live test. While the first one would have been averted by
by rbanffy 7y ago
It sure doesn't look good to have two software issues very late in the product development cycle, on a live test. While the first one would have been averted by a human crew, the second one would not be so benign.
Software is hard. Embedded software doubly so, but... Come on... This should not be happening to Boeing.
- sho_hn 7y agoOne of the takeaways of the MAX debate maybe was "yes, this should be happening to Boeing" as a result of specific steps to weaken the engineering leadership in the company from the top down. If that's the case we can only hope it makes for the case study.
- rbanffy 7y agoKind of yes, but this is a different part of Boeing. If I were one of the astronauts who'll fly Starliner, eventually, I'd not be nearly as polite as the formal communications suggest. I'd probably be reading code, sitting next to an engineer, and asking them to explain to me what the code does. The thruster map error should have been detected in simulation. If it wasn't, the simulator is also faulty. I'll assume the thruster map was only slightly wrong and that whatever simulator runs they did with it were very subtly off. Still... What a mess...
- bumby 7y agoThere are specific requirements to assure the fidelity of simulators so this still should have been caught if the design process was robust enough I think
- robkop 7y agoIf you listen to the NASA update [1] you'll hear the audit team state that if Boeing was following the procedures that they stated they were doing they would have found the flaw at 4 separate places. Let's just say the auditors tone of voice says it all. [1]: https://www.youtube.com/watch?v=hxQ_ZV26E04 https://www.youtube.com/watch?v=hxQ_ZV26E04
- DennisP 7y agoThat's an hour-long video, could you tell us where the auditors said that?
- homonculus1 7y agoIt starts right at the 47 minute mark, and the whole segment starts at 44:45
- MaupitiBlue 7y ago> specific steps to weaken the engineering leadership What in the world are you talking about? There’s been no reporting of anything like that. The MAX engineers failed all by themselves. No management told them to design MCAS in a brain dead fashion. Nobody “weakened” engineering leadership.
- toss1 7y agoWhen management makes statements like "we don't need [to pay for] senior engineers here, these are mature products... ", and clearly putting finance first among corporate goals, the natural result is that engineering dies a death by a thousand cuts...
- MaupitiBlue 7y ago> When management makes statements like "we don't need [to pay for] senior engineers here The problem is that Boeing management never said that. Moreover, the fired CEO was an engineer.
- TheOtherHobbes 7y agoThe important word being "was". As an engineer, he was accountable to reality. As a CEO, he was accountable to the board and the financials. Guess which won.
- Brave-Steak 7y agoMuilenberg became CEO in 2015. The McDouglas thing happened in '97. He inherited an existing management structure that was already primarily interested in profit over all other concerns, especially engineering. Moreover, the 737 Max program ran from 2011-2015. The CEO at the time was an MBA.
- throwawayjava 7y ago> Software is hard Traditional engineering companies don't respect software. You can tell by the fact that they pay well below market rates.
- rbanffy 7y agoSo, I guess we should start calling it the Starliner MAX...
- jillesvangurp 7y agoI think maybe the difference here is the fact that SpaceX probably treats software as a first class citizen; just like Tesla does, and is likely to have a modern view on how to build and evolve software. Additionally, software is a key component for them that is very much determining the abilities of the hardware. Tesla even ships pure software features that they charge money for. That's unheard off in the car market. And I would expect, Elon Musk to drive a similar strategy in SpaceX. I suspect Boeing maybe treats software the same way as they've always done, just one of many boxes that need to be ticked in a long waterfall like process. They just throw more people at it hoping it gets done on whatever time line they imagine it needs to be done. They are likely to be very conservative with respect to tools, technologies, and practices (i.e. not much has changed there in decades). The fact that SpaceX is able to come up with a new design for Starship and can then get it and the software working for several successful hovers & hops in around 9 months, tells me they are able to iterate quickly and adapt to quite major design changes. They launch a lot of rockets and they seem to be learning a lot every time they do this. I don't see how they'd be able to do this without very solid software development practices. I'd expect lots of CI & test harnasses, probably lots of emulators and other tools, and I have a hunch they probably use a lot of static code analysis etc. to prevent preventable bugs from happening.
- vonmoltke 7y agoIt also helps that there is no union stopping SpaceX from driving it's engineers and technicians to tens of hours of unpaid overtime.
- davidgrenier 7y ago1 million lines of code. I hate to break it to you, it should be happening, whether you are Boeing or not, but especially if you are Boeing. How can that even be "reviewed" in any way but superficially in a time frame less than 5 years?
- deleted 7y ago[deleted]
- rbanffy 7y ago"For a successful technology, reality must take precedence over public relations, for nature cannot be fooled." -- Richard Feynman
- ceejayoz 7y agoWeird to cite Feynman here, in this context. https://en.wikipedia.org/wiki/Rogers_Commission_Report https://en.wikipedia.org/wiki/Rogers_Commission_Report
- mkl 7y agoWith enough developers. Why do you see that as a problem? If the code is well structured, most parts of it can be reviewed and tested in parallel.
- travisoneill1 7y agoI would bet that the truly critical parts of the software are a fraction of that million lines.
- marsokod 7y agoI am just wondering if all these issues are not linked to a same error that would be: we loaded an old version of the software on the spacecraft. It can be quite common in the space industry to load non-flight or old versions late in the AIT phase in order to test on other modules, or even just to officially close old actions. But before delivering everything we would check all the versions, and make sure that everything is as expected and most importantly, as described. If that step was screwed up, it is bad news for the QA, but that would explain why the errors could be found and fixed quickly: it meant just going through all the non-conformances and change logs and understand what was different between the version used, and the version that should have been used.