3 ms·
The 737 Max situation (among other things) stems from trying to cram a complex system into an existing simpler one while staying within existing constraints to
by hobofan 7y ago
The 737 Max situation (among other things) stems from trying to cram a complex system into an existing simpler one while staying within existing constraints to avoid recertification.
With a new design "from scratch" like this which would need new certification anyway, this wouldn't be an issue.