3 ms·
The rails are already used for ground/return current. The single overhead wire is at 25kV (or higher for this speed test). It is only where the vehicle has rub
by Symbiote 7y ago
The rails are already used for ground/return current. The single overhead wire is at 25kV (or higher for this speed test).
It is only where the vehicle has rubber tyres (i.e. trolley buses) where there are two overhead cables.