3 ms·
The 5% is quoted further in the article for overall grid waste. The per mile basis is purely there to compare why higher voltages for the Samer power lead to le
by duckymcduckface 7y ago
The 5% is quoted further in the article for overall grid waste. The per mile basis is purely there to compare why higher voltages for the Samer power lead to less waste.