3 ms·
If the tunnel was 0% done on November 15, and is 50% done today, why isn't the tunnel opening before 2021? If this is actually their rate of progress, the tunne
by Rebelgecko 7y ago
If the tunnel was 0% done on November 15, and is 50% done today, why isn't the tunnel opening before 2021? If this is actually their rate of progress, the tunnel should be ready by March.