Musk never learned that most of the cost of subways is the stations and supporting infrastructure, not digging the tunnel itself. Musk has not proposed any imp
by gamblor956 7y ago
Musk never learned that most of the cost of subways is the stations and supporting infrastructure, not digging the tunnel itself.
Musk has not proposed any improvements to the expensive parts of tunneling.
- ryantgtg 7y agoMost of the costs are also emergency systems, such as ventilation and frequent exits. From what I've seen (I'm not an engineer or a tunnel expert), his tunnels do not account for these things. The standards, which cost a lot to meet, are there for a reason.
- aeharding 7y agoWhat I am skeptical about is putting large car batteries in tunnels, which store enormous amounts of energy that could potentially be released in combustion and need be managed by adequate ventilation and fire suppression systems. Versus an electric train. Theoretically, since the energy is transported into the tunnel via power lines, wouldn’t fire suppression and ventilation systems be cheaper since they wouldn’t need to handle so much stored energy potential (via batteries) traveling through a tunnel?
- deleted 7y ago[deleted]
- ryantgtg 7y agoYes, seems like it. An engineer acquaintance who builds subway tunnels says that they put in emergency exits every X feet, so that emergency-exiting people never have to walk more than a certain distance before they have a chance to make it to ground level. And in the case of an emergency, massive ventilation fans kick in (that are otherwise dormant). So, from what he's told me, the costs are less in suppression than in providing safe exit opportunities.
- jejeyyy77 7y agoLol reading the comments in this sub show how clueless the general population is. Probably the same people that said Tesla was vaporware. To answer your question: He’s not building subway tunnels. It’s tunnels for Tesla vehicles.
- nonanonymous 7y agoThat doesn't exactly improve the ROI.
- thedrbrian 7y agoIt makes it a lot worse. You can fit a load of people on a subway train versus a model s or x
- pjkundert 7y agoYou’ve got the wrong perspective. From the perspective of the city, the ROI of a subway train is high. From the perspective of an individual, the ROI of using my own car in a tunnel, exactly when I want to, without parking, waiting, embarking, smelling the vagrants, disembarking, walking or getting a cab, ... Priceless!
- bluGill 7y agoFrom the perspective of an individual, the ROI of using my own car ON a FREEWAY, exactly when I want to, without parking, waiting, embarking, smelling the vagrants, disembarking, walking or getting a cab, ... Priceless! My corrections in CAPS. I don't think I need to say more, it should be obvious way tunnels for cars are a bad idea.
- mc3 7y agoBut... the city is you! Without the trains that's more cars in your way when you drive your car.
- jellicle 7y ago> exactly when I want to What about everyone else and their cars?
- spectrum1234 7y agoThis is completely wrong. The biggest costs to tunnels is bureaucracy. Simply using private funds without numerous contractors can decreases costs by an order of magnitude with no technological improvements.
- modo_mario 7y agoWell sucks that it relies heftily on public funds then.
- asdff 7y agoSimply using public funds to employ a workforce rather than contract one would save the most money due to eliminating the need to house and feed shareholders and turn a profit, but voters seem to like the contractor profiteering model even if it eats the public purse. NYC only has a big subway system because it gobbled up all the failing private railways over the years. LA used to have the largest rail transportation network in the world, it was private, and it too failed to turn a profit and failed. Transportation runs at a loss.
- hurricanetc 7y agoUsing public funds to employ a workforce is basically “How to Bloat 101.” The MTA in NYC is a shining example of taxpayer waste. They call it “Money Thrown Away” for a reason.
- gamblor956 7y agoThe biggest costs to tunnels is bureaucracy. This is false. The biggest cost to tunnels is moving and replacing utility lines (power, internet, sewage, water, etc.) that were not properly recorded by private entities when they constructed their buildings. It's precisely where government bureaucracy was involved that tunneling is the cheapest, because then moving and replacing the utility lines can happen all at once instead of over the course of months as the tunneling machine bores into them, and bureaucracy can coordinate road closures, utility shutoffs, etc. Also, private entities use subcontractors not because bureaucracy requires it but because it lets them delegate out responsibility for areas in which they do not have competence for less than the cost of developing such competence in-house. It's simply the way the construction industry works. Even Joe Blow Contractor rebuilding someone's bathroom will hire contractors to do specific parts of the rebuild (like the plumbing, or the tiles). Another example: the SoFi Stadium in Inglewood has hundreds of subcontractors, and is fully privately funded.