4 ms·
This stuff goes in a retrospective. Airing of non specific grievances, therapy, etc. A scrum should be as short as possible.
by ses1984 7y ago
This stuff goes in a retrospective. Airing of non specific grievances, therapy, etc. A scrum should be as short as possible.