I'm not disputing that there'll be pain, or that we shouldn't be building them so quickly. I'm disputing how much pain and structural lock-in there'd be. The a
by wahern 7y ago
I'm not disputing that there'll be pain, or that we shouldn't be building them so quickly. I'm disputing how much pain and structural lock-in there'd be.
The article says that "planned investment in new gas power plants and pipelines totals over $100 billion", but that "by 2035, over 90 percent of proposed combined-cycle gas plants, if built, would be uneconomic to run compared to the cost of building a new clean energy portfolio."
Considering how quickly plants can built and how clean they are, at least in the sense of environmental regulations requiring long lead times (and therefore sunk costs) in preparing sites, if the predictions are true then energy executives should be able to pivot rather quickly. Most of the risk in a roadmap for building a bunch of gas plants isn't in being locked into building the gas plant, it's in the opportunity cost of not preparing for whatever the alternative will be. So long as wind and PV have similar initial costs, then pivoting should be easy. "Planning" to build $100 billion in gas plants is alot different than planning to build $100 billion in nuclear or hydro.
FWIW, I'm not disagreeing that maybe we should be incentivizing renewables more, but I can't get too worked up about it, either. The factors that make natural gas easy to switch to also make it easy to walk away from, particularly if you're walking away from planned construction.