4 ms·
I think you are ignoring all OP’s points about short term memory and not getting side tracked on optimizations. The latter of which gets me all the time. So yo
by SlowRobotAhead 7y ago
I think you are ignoring all OP’s points about short term memory and not getting side tracked on optimizations. The latter of which gets me all the time.
So you would recommend instead of moving a long he drops what he’s doing and go link the ticket number back into code just to leave a TODO that in high likelihood is him working on eventually or not anyhow? Weird flow but ok.
- yoz-y 7y agoJust do it after you finish and before you send your code for review. Just don’t merge dangling TODOs
- arcticbull 7y agoExactly by all means have them in your working branches but track them before they hit master