4 ms·
The TGV entry skips over the 20 years of R&D on high speed rail that preceded the first major construction, much of which was wasted on gas turbine designs.
by gok 7y ago
The TGV entry skips over the 20 years of R&D on high speed rail that preceded the first major construction, much of which was wasted on gas turbine designs.