3 ms·
Not you, mannykannot, the person I replied to in this thread. > the failure of a test conducted within operational parameters should be treated as seriously as
by gpm 7y ago
Not you, mannykannot, the person I replied to in this thread.
> the failure of a test conducted within operational parameters should be treated as seriously as a failure in actual use.
Everything before the "should be".