4 ms·
A billion dollar would be dirt cheap for a clean sheet design. The MAX program (including its engine) is estimated at $2B-3B. For a clean sheet successor a safe
by Xixi 7y ago
A billion dollar would be dirt cheap for a clean sheet design. The MAX program (including its engine) is estimated at $2B-3B. For a clean sheet successor a safe assumption would be 7 to 8 years to EIS and $15B in investment.
- Aloha 7y agoI assumed it was north of 5b, but I was on my phone at the time and didnt look up costs.