4 ms·
I imagine you can find all sorts of numbers in their 12000 page report to the NRC, I assume located here https://www.nrc.gov/reactors/new-reactors/design-cert/
by boomboomsubban 7y ago
I imagine you can find all sorts of numbers in their 12000 page report to the NRC, I assume located here
https://www.nrc.gov/reactors/new-reactors/design-cert/nuscale.html https://www.nrc.gov/reactors/new-reactors/design-cert/nuscal...
- Animats 7y agoYes, and this is the main document to read.[1] There's some hand-waving on safety issues in Table 1.9-2. NuScale passes the buck on flooding issues to the plant owner. Also, there's some hand-waving on software safety issues: "The NuScale design applies RG 1.152, Revision 3 and IEEE Std. 7-4.3.2-2003 that it endorses. For RG 1.168, the requirements of IEEE 1012-2004 are tailored to the NuScale I&C development lifecycle, which is different from the conceptual waterfall lifecycle in IEEE 1012-2004. The applicable tasks from IEEE 1012-2004 to the I&C development are mapped. Some administrative mandatory requirements in the standard conflict with established Engineering or QA documentation requirements. The requirements of IEEE 1028-2008 are tailored to the NuScale I&C development lifecycle." This may mean "We use Agile and your outdated rules don't apply". The key concept is that, since these plants are passively cooled and don't require pumps for cooling, many of the concerns about keeping cooling water flowing to prevent a meltdown don't apply. "For the NuScale design, the safety analysis shows that core damage does not occur during any design basis event.", says the application. What could possibly go wrong? A big concern is that NuScale proposes to put up to 12 reactors in one connected pool. I haven't found the part yet where they discuss what happens if one leaks and contaminates the whole pool. Or the pool springs a leak and drains into the ground. These are not small plants. A 12-unit plant is 720MW of electrical power, so it's getting close to a typical gigawatt sized plant. More small units, instead of one big one. The history of power reactor meltdown incidents is roughly as follows: - Three Mile Island - meltdown, big containment vessel, fully contained, expensive but not hazardous. - Chernobyl - fire, meltdown, no containment vessel, radioactive material dispersed over large area. - Fukishima - meltdowns, undersized containment vessels breached, radioactive material dispersed over moderate sized area. A certain amount of skepticism about designs that "don't need" a big containment vessel is perhaps justified. [1] https://www.nrc.gov/docs/ML1924/ML19241A398.pdf https://www.nrc.gov/docs/ML1924/ML19241A398.pdf
- xorfish 7y agoThere are designs that don't need a large containment vessel because they operate at normal pressure and there is no water that might expand by a factpr of 1000. Look at the IMSR.
- Animats 7y agoNuScale is a pressurized water reactor whose containment sits in a water-filled pit.
- andromeduck 7y agoIsn't the pool secondary containment so leaking into the pool is bad but not really any different than if primary containment failed for any other plant. You can find leaks in pools pretty easy by using a double lining and distributed sensors or in closed environments like this, by measuring net flows and looking out for any net change in volume.
- baking 7y agoThe pool is for passive secondary cooling if the primary fails. It is outside the containment and is intended to boil off over 30 days if there is a complete blackout. 30 days is all you need for the decay heat because after that air cooling is sufficient.
- Animats 7y agoNot 30 days. 72 hours. "Water inventory in the reactor pool is adequate to cool the NPMs for at least 72 hours without adding water." NRC filing [1], page 41, bottom of page. A NuScale press release does say that. "The system is capable of providing 30 days of cooling without adding water to the pool."[2] The web site hype goes even further: "Should it become necessary, NuScale’s SMR shuts itself down and self-cools for an indefinite period of time, with no operator action required, no additional water, and no AC or DC power needed."[3] But that's not what the NRC filing says. Looks like they make bigger claims when they think they can get away with it. [1] https://www.nrc.gov/docs/ML1924/ML19241A398.pdf https://www.nrc.gov/docs/ML1924/ML19241A398.pdf [2] https://newsroom.nuscalepower.com/sites/nuscalepower.newshq.businesswire.com/files/doc_library/file/nuclear-exchange-sept-2011.pdf https://newsroom.nuscalepower.com/sites/nuscalepower.newshq.... [3] https://www.nuscalepower.com/ https://www.nuscalepower.com/
- mdorazio 7y agoThanks for this link. I've only read a few sections, but I can't find any cost info at all. Also they're not really saying anything about waste management that's useful. Summary: "The SRWS processes solid waste by dewatering, decontaminating, surveying, sorting, and classifying solid waste for storage and eventual shipment to licensed offsite facilities." (basically the same process with the same issues I have with "regular" nuclear plants). They do answer my water concerns, though - looks like no external cooling water is needed in normal operation, but their design is food susceptible so it needs to be built in places that cannot flood.