3 ms·
A lot of the below comments touched on things we do (verifying that changesets are independent, breaking tests into smaller pieces, prioritising changes that ar
by gregdoesit 7y ago
A lot of the below comments touched on things we do (verifying that changesets are independent, breaking tests into smaller pieces, prioritising changes that are likely to succeed). They add up and the approach does become more complex. We wrote an ACM white paper with more of the details[1]. It’s the many edge cases and several optimisation problems that turn this into an interesting theoretical and practical problem.
[1] http://delivery.acm.org/10.1145/3310000/3303970/a29-ananthanarayanan.pdf?ip=213.208.239.146&id=3303970&acc=TRUSTED&key=4D4702B0C3E38B35%2E4D4702B0C3E38B35%2E4D4702B0C3E38B35%2EE47D41B086F0CDA3&__acm__=1575290605_b9398003215d133482dd4a9255ce1f17 http://delivery.acm.org/10.1145/3310000/3303970/a29-ananthan...
- pojzon 7y agoSorry, but that link points to "not found" page.