The costs to built the plants dominates the price. Once built the actual operation and fueling costs are best in class https://www.expressnews.com/business/eagl
by StillBored 7y ago
The costs to built the plants dominates the price. Once built the actual operation and fueling costs are best in class https://www.expressnews.com/business/eagle-ford-energy/article/Nuclear-energy-in-doubt-amid-high-costs-11946922.php https://www.expressnews.com/business/eagle-ford-energy/artic...
The majority of the cost to build the plants are due to the crazy uncertainty about the design/build timeline every-time one is built. Given that conceptually they aren't any more complex than your average coal plant those costs are massively over inflated by a number of factors. Frankly if there was a COTS design pre-certified, then it might be possible to wipe out a huge fraction of the built cost.
- akiselev 7y ago>> NIMBYism > The majority of the cost to build the plants are due to the crazy uncertainty about the design/build timeline every-time one is built. Given that conceptually they aren't any more complex than your average coal plant those costs are massively over inflated by a number of factors. Frankly if there was a COTS design pre-certified, then it might be possible to wipe out a huge fraction of the built cost. NIMBYism is a large reason why the risks are so uncertain and the costs so high. When dozens of judges at several levels have jurisdiction to require expensive and time consuming state/federal EPA, zoning, air quality, shading, etc. reviews and plaintiffs can use delay tactics to block appeals to those rulings, you get lots of uncertainty and expense.
- Spooky23 7y agoCapital costs matter. If they didn’t, we wouldn’t have mortgages or lease cars.
- creato 7y agoThis is missing the point. The point is that your house or car would be outrageously expensive too if the engineering cost of the design was amortized over very few units.
- Spooky23 7y agoThat's precisely the point. Once the direct subsidy of nuclear via the military's nuclear weapons buildout went away, new plant construction... went way. The capital costs of any traditional power plant are massive, and fix high costs of goods sold for the life of the plant. This Canadian effort may find a way to build more smaller units, which will be great if they succeed. Solar and wind are disruptive because the cost to add a marginal unit of generation is near zero. A marginal add of a natural gas power plant in my US state is nearly $100M and several years. Nuclear is probably 10x that. I understand why nuclear is an appealing technology. Its magical in a way, but it doesn't make sense when engineering a power grid today. It is an awful business with high fixed costs getting disrupted by smaller, cheaper, lower friction alternatives. Again, in my state, New York, despite higher than average rates, nuclear operators like Excelon claim to be losing money operating old plants, and NY ratepayers will be providing $7-10B in subsidy over the next 10-12 years.
- creato 7y ago> Once the direct subsidy of nuclear via the military's nuclear weapons buildout went away, new plant construction... went way. I don't think there was ever a direct subsidy of civilian nuclear power for weapons production. The ways in which military reactors are run to produce fuel for weapons is different than that of power plants. There are dual use technologies involved, shared R&D costs, and so on, but there is no direct subsidy of civilian nuclear power the way you are implying. > The capital costs of any traditional power plant are massive, and fix high costs of goods sold for the life of the plant. I'm pretty sure you are in fact missing the point. The costs of building a modern nuclear plant include a huge amount of one-off engineering because we build so few of them. If we swapped the numbers of units built of coal and nuclear power plants, the cost structures would (probably close to) swap as well, which was the original parent of this thread's point. Look, I'm not here to advocate for nuclear power. I think renewables + batteries are likely to win on economics in the near future, but with some major challenges (building enough batteries for the long tail of intermittent production lapses seems really difficult to me). But that doesn't argue against the fact that we shot ourselves in the climate change foot by not prioritizing nuclear over coal power for decades, and I think a big part of that is based on a mistake ("nuclear is expensive") is because of this inability to amortize costs over more units. edit to add: I think your singling out of capital costs is a strawman of the original comment ("Frankly if there was a COTS design pre-certified, then it might be possible to wipe out a huge fraction of the built cost."). It's unclear whether you are including certification and engineering costs in "capital costs", but the intention of the original point was to include those costs.
- altacc 7y agoExpensive to build and cheap to run ignores the high decommissioning and long term waste management costs (both financial & practical impacts). If you add that to the kilowatt price, nuclear tends to end up more expensive than most other options.
- kortilla 7y agoCitation needed. Also, don’t try to include plants that were shut down early or plants built on designs from the 50s.
- altacc 7y agoYour oblique point that the costs for newer reactors are probably going to be less than older reactors is acknowledged, but it's still a cost consideration. https://www.oecd-nea.org/ndd/pubs/2016/7201-costs-decom-npp.pdf https://www.oecd-nea.org/ndd/pubs/2016/7201-costs-decom-npp.... A lot of this report seems to indicate that estimating future decommissioning costs is hard. The costs are estimates, often created by those with a financial incentive to keep the estimate low. In 50 or so years time the reality of decommissioning might be very difficult. On the waste aspect: "The cost of managing spent nuclear fuel ... is not always included in the cost of decommissioning, but is often treated separately. This is even more the case for the final disposal of fuel or related waste, which is a major source of costs in waste management, particularly for high-level waste."
- cf498 7y agoReading the article (and hoping i didnt just read over the part), they never mention the word waste once when it comes to the cost calculation. Thats rather convenient seeing as the number of functioning deep repository sites today is rather limited. What good are small operating costs when the build costs are this expensive and we dont have a viable solution for waste management (yet?). In practice these costs are externalized to the tax payers and next generations of tax payers. As long as we dont have a functioning waste management, waste is a constantly running cost that wont stop at the end of the reactors lifetime. As long as we dont realistically factor in the waste management cost, nuclear is highly subsidized by the following generations who have to pay for the running cost of waste management. That just doesnt make sense. Dont get me wrong, i am not anti- nuclear. It just doesnt make sense to me at this point from an economics perspective. When factoring in the cost of waste management and decommissioning the power plants after the end of its lifetime, they are absurdly expensive. All this not to mention the absurd follow-up costs of having to dig out collapsed long time storage yet again. I dont see how nuclear today is not just another technology that offers a unsustainable, quick and cheap energy source that externalized the costs to the next generations. The running costs of all those waste management failures is starting to add up, and when looking at Germany, who set an exit date for nuclear power, the cost of decommissioning the power plants themselves is going to be a massive loss for the tax payer, even if everything would work as planed. Which, when looking at the history, we can be sure it wont. I am not convinced yet that nuclear doesnt just look good on paper. Get me a realistic calculation for the actual energy price without externalizing the cleanup costs to the tax payer and we can talk. Dont factor in waste management at a fixed price the state offers and dont just assume that no meltdown cleanup will ever be necessary. But i have yet to see anyone make the argument that way, which lets me assume, that nuclear is a wonderful technology to research until someone finds out how to run plants economically viable without just externalizing costs.
- Wowfunhappy 7y ago> It just doesnt make sense to me at this point from an economics perspective. What are you comparing it to? Are you factoring in economic costs of continuing to release carbon into the atmosphere? (I don’t want to excuse lazy/bad accounting... but traditional power plants don’t factor in the cost of the carbon they release, so basically everyone is ignoring long-term costs.)
- TheHypnotist 7y agoThe trouble is that some markets will operate at a loss due to the glut in Natural Gas. See the northeast reactors.