2 ms·
I would expect the analysis is done via FEA. Those models are not perfect but.. Suppose the FEA indicated the highest stress at the same point it failed. Maybe
by phkahler 7y ago
I would expect the analysis is done via FEA. Those models are not perfect but.. Suppose the FEA indicated the highest stress at the same point it failed. Maybe it predicted failure at 102 percent. In that case, doing a reinforcement that allows the whole plane FEA to reach 104 percent should really be sufficient.
I still believe in retesting, but I can see how confidence could be high without it. In this case I'd actually prefer letting it pass vs making a change without retesting since the loads are way outside of normal and it came so close. Best of course is to make the change and test again.