2 ms·
> You didn't bother to read the article. I did, their entire premise is invalid. They are either very bad at math, or engineering, or both. The metal part, sc
by baybal2 7y ago
> You didn't bother to read the article.
I did, their entire premise is invalid. They are either very bad at math, or engineering, or both.
The metal part, screw drive, and simple pulleys and etc are nor hard, nor expensive. Saying it otherwise is purest bs.
The limits of precision of theodolite are more than enough position for precise initial reference.
Existing solar thermal farms were not designed for generation of process heat in mind to begin with, so them saying that they suck at that because of their "design" is a PR trick.
Existing thermochemical processes are profitable enough to burn oil for them, and if one minds anything cheaper, they will first consider CHP colocation before thinking of anything as weird as this.
- brohee 7y agoThe precisely curved mirrors are expensive, and likely dominate the BOM. And tanks to economy of scales, electronic systems are now often cheaper than mechanical ones.