I'm not sure how common these are in an industrial setting nowadays, but back then all big electrical tooling would leak at least a little bit and if you hooked
by jacquesm 7y ago
I'm not sure how common these are in an industrial setting nowadays, but back then all big electrical tooling would leak at least a little bit and if you hooked them up through ground fault interrupters those would trip all the time.
A typical lathe, mill, plasmacutter or welder (which that particular workshop was full of) would be in the 10KW range with peaks far in excess of that during start-up.
I don't remember if we had the office area (where I was working) on protected circuitry or not, that would have been an interesting bit of data. The building still exists, I'm almost tempted to go and have a look.
That HV supply was a pretty beefy one by the way, the crocodile clamp that made 'first contact' was gone entirely.