3 ms·
> Several hours into his shift, Dillon was helping guide a rack into place so it could be bolted into the factory floor. The racks are so heavy it takes a team
by dragontamer 7y ago
> Several hours into his shift, Dillon was helping guide a rack into place so it could be bolted into the factory floor. The racks are so heavy it takes a team of four people to maneuver them.
The issue is that these guys are moving very heavy shelves by hand, instead of using forklifts.
I would assume that moving heavy equipment around is a pretty standard case in a car factory. It probably shouldn't be lifted by human muscle, which is prone to failure and coordination issues.