3 ms·
I have that now in a project. I have two things that need t o be made where I just don't know if I'm going to get them to work well within the larger design I h
by Scarblac 7y ago
I have that now in a project. I have two things that need t o be made where I just don't know if I'm going to get them to work well within the larger design I have in mind. I wanted to prototype them in the summer but the backend wasn't ready so I only had very small mock data served in an unrealistic way.
The only thing I can do is move them to the front of the project as much as possible, so we have the risky bits as early as possible. Once we get them to work the rest should be smooth sailing, but I'd rather fail when that time wasn't spent yet. PM agrees.
- meh2frdf 7y agoThat’s why you do a time boxed spike, ie a fixed amount of time to do the investigation so you can work out your preferred approach. After you have sufficient knowledge then you can estimate.