3 ms·
AFAIK the basic science has advanced enough that cheap experiments are not the best way forward. We basically know that designs like ITER work if you build them
by adrianN 7y ago
AFAIK the basic science has advanced enough that cheap experiments are not the best way forward. We basically know that designs like ITER work if you build them sufficiently large. There are still some engineering hurdles to be taken, and there might be better designs that can be built cheaper (e.g. Stellarators?), but we're at the stage where we need to build big machines if we want to progress rapidly.
- theothermkn 7y agoThe limiting factor for ITER was the strength of magnetic fields that could be attained from the superconductors available at the time. The promise for ARC/SPARC at MIT is that the field strengths available have recently doubled, and performance goes something like the 4th power of field strength, so a smaller reactor can reach the conditions that only a larger one could have reached when ITER was designed. These smaller reactors should be cheaper and faster to build.
- baking 7y agoThe limiting factor for high temperature superconductor magnets will likely be the mechanical strength of the structural steel holding the magnets together, not the limitations of the HTS. This is not a bad thing, just that the HTS are so much better than traditional superconductors at handling high magnetic field strength that you now have to optimize for the steel enclosures.
- saalweachter 7y agoThis is actually refreshingly exciting, coming from the usual "interstellar travel is slow and depressingly hard, space elevators are iffy at best, we probably aren't smart enough to build programmable nanotech" we get from most news updates on future tech. Are suitcase-sized fusion reactors still on the table, or does this just mean smaller-than-a-football-stadium fusactors are probably possible?
- baking 7y agoYou still need a one meter thick blanket of lithium to capture the neutrons from the D-T reaction (and to generate more Tritium) so you are looking at modular 500MW reactors, although locating multiple reactors on the same site makes sense for fueling and maintenance purposes.