3 ms·
> At this point it takes the same amount of energy (embodied energy, called grey energy in Germany) to erect a Passivhaus as it will need operating over the nex
by taneq 7y ago
> At this point it takes the same amount of energy (embodied energy, called grey energy in Germany) to erect a Passivhaus as it will need operating over the next 50 years.
Is that because the build energy is so high or because the energy usage is so low? I mean, by definition the energy used by a zero-energy house is zero. Shouldn’t you compare the build cost to a conventional house’s energy usage?