3 ms·
> I'm very confused on how the extra $100 would meaningfully affect the project in either time or BOM. reply That one change was the tip of a very large icebe
by robomartin 7y ago
> I'm very confused on how the extra $100 would meaningfully affect the project in either time or BOM.
reply
That one change was the tip of a very large iceberg. They easily added somewhere in the order of $50K+ to the total cost of the system. I could have installed triple the power generation capacity for that money.
BTW, I did the bulk of the work on this installation myself (with the help of my kids here and there). No general contractor involved. Had there been a contractor on the job the cost would have been far greater.
Before someone jumps in and says "You probably screwed-up the design" (after all, this is HN). I designed the entire system, hired a civil engineering firm to review the design and calculations as well as provide stamped blueprints and calculations (you can't get a permit unless you have this).
I also consulted with the same plan checkers throughout the design process (before hiring the civil engineering firm) as well as with my suppliers and buddies who had built similar systems.
I only hired the civil engineering firm one the plan checkers told me verbally that all looked good and I should move forward, hire the engineering firm and submit the drawings and calculations for official approval and issuance of permit. I got verbal "All is good" from the structural, electrical, planing/zoning and fire plan checkers.
Three days after I submitted everything for approval the very same plan checker who told me all looked good rejected the very same plans he and I had discussed during weekly meetings for about two months. Things got surreal from there.
I spoke to multiple contractors from different trades during my many visits to the plan check office. I did not find one who did not have horror stories --multiple horror stories-- about dealing with these people.
Anyhow, it's a somewhat distant memory now.
- bradstewart 7y agoThis, unfortunately, seems to be the norm here in Austin as well. There's an entire industry of building permit "expediters" you almost have to hire to avoid the nonsense. This 3rd party handles all communication with the relevant permitting authorities, and mostly correct plans get approved almost immediately.
- robomartin 7y agoI got lucky in that our inspector was fantastic and very helpful. Had it not been for her help and advise it could have been worse.