4 ms·
This section is not present in the 2015 or 2016 edition of the rulebook: https://www.bav.admin.ch/bav/de/home/rechtliches/rechtsgrundlagen-vorschriften/fdv-2016
by fsh 7y ago
This section is not present in the 2015 or 2016 edition of the rulebook: https://www.bav.admin.ch/bav/de/home/rechtliches/rechtsgrundlagen-vorschriften/fdv-2016.html https://www.bav.admin.ch/bav/de/home/rechtliches/rechtsgrund...
Seems like overflow detection (or more bits) were added to the counters at some point.
- kposehn 7y agoYep. They routinely run fairly long trains over the Lotschberg and Gotthard lines through the base tunnels that I’m pretty certain are approaching 256 axles, but I have yet to see any with more. Most likely the main transalpine lines now allows >256 axles while other secondary lines have not been upgraded.
- SkyPuncher 7y agoTrains longer than 256 aren't the issue as the numbers roll over. The problem is trains with exactly 256 axles (or a multiple of 256), they're seen as zero.
- dTal 7y agoNot an expert, but I imagine it could still cause some routing problems if a 258-axle train were mis-registered as a 2-axle train; the latter takes up dramatically more space on the network.
- dwild 7y agoConsidering that a train can require 2 km to break, I'm sure they keep enough space between trains that there's plenty of space for both 258 or 2 axles trains. Knowing a train is there seems much more important than its lengths (up until they decide that 2 axles trains can be much closer to another trains).