4 ms·
Thanks, that was a really quick check. And yeah, that would increase the costs markedly. (My initial thought on posting was that $30 billion would not be enou
by dredmorbius 7y ago
Thanks, that was a really quick check. And yeah, that would increase the costs markedly.
(My initial thought on posting was that $30 billion would not be enough, though the first read of actual per-mile costs, neglecting per MW-mile, seemed to suggest otherwise.)
- deleted 7y ago[deleted]
- tamaharbor 7y agoYou are multiplying transmission line costs by distribution costs per mile?
- Pinckney 7y agoThis PDF from Wisconsin puts the cost at $280k-390k/mi depending on the voltage of the line. They put the cost of underground transmission lines at $1.5M-2M/mi for the same voltages. https://psc.wi.gov/Documents/Brochures/Under%20Ground%20Transmission.pdf https://psc.wi.gov/Documents/Brochures/Under%20Ground%20Tran...