3 ms·
The costs in this case was $1000000 per airframe sold if Class D simulator training was required, which resulted in the decision to go with the single sensor de
by salawat 7y ago
The costs in this case was $1000000 per airframe sold if Class D simulator training was required, which resulted in the decision to go with the single sensor design.
This was discussed in the 60 Minutes Expose.
https://youtu.be/QytfYyHmxtc https://youtu.be/QytfYyHmxtc