Construction of the tram 8 extension took place 2015-2017, total costs of 170mio. The length of new tracks was only a few hundred meters, the rest of the line i
by wereHamster 7y ago
Construction of the tram 8 extension took place 2015-2017, total costs of 170mio. The length of new tracks was only a few hundred meters, the rest of the line is sharing tracks with existing lines. Everything above the ground. Difficult part of the construction was the fact that the new tracks were built across an existing bridge that is also used by car traffic. Nothing too difficult I suppose, just a bit of clever traffic management was needed (both during construction and afterwards).
- sschueller 7y agoI believe when the bridge was renovated a few years before, it was re-enforced to be able to take the load of a tram. The approval to run a tram over it came later. Similar thing happened with the subway that was never built. The station and a few tunnels where already dug because of renovations but the people voted no on building a subway. That part of HB turned into the SZU Station. The tram tunnels by the Tierspital where also meant for the subway from what I recall. When they converted those for the use with trams they had several issues like the tunnel being not heigh enough. You can see the tracks are very low and the electrical connection on top is almost completely compressed.