Full tech report of UK 9th August power outage
- trebligdivad 7y agoFun bits: * Software upgrade your wind farm to remove bad responses/oscillations * Software upgrade on trains removed ability for drivers to reboot them (& they intend to keep it that way?!) so hand to send techs with laptops * Upgrades needed to improve loss-of-mains detection in small generators.
- mrob 7y ago>Software upgrade on trains removed ability for drivers to reboot them (& they intend to keep it that way?!) From section 5.2.1: "The train manufacturer, Siemens, are developing a patch which will allow the drivers to recover the trains themselves without the need for a reboot or technician to attend site."
- cat199 7y agosounds like '737 max' engineering again. sigh.
- goatinaboat 7y agoFinally an explanation of what a train driver actually does - they are there to reboot the automation if necessary. But what have they been doing up until now? Train driving is a very well paid job, over twice as much as a bus driver, for a fraction of the work... they don’t even steer it!
- tialaramex 7y agoLots of responsibility in driving a train. That's usually going to be dozens, and for some trains regularly hundreds of passengers, or in freight hundreds or thousands of tonnes of freight. It's psych-profiled, companies which employ drivers will be looking for "compliance" (a psychological tendency to obey rules even if you don't understand why) so that the driver obeys all the safety rules. It's also a fairly complicated machine, not as complicated as a jet liner but far more complicated to operate than a bus, so that reduces your pool of candidates further, in most cases they'll be looking for someone with some mechanical aptitude to understand how it works. They need communication skills, the driver needs to work with their signallers, and potentially also company dispatch, and on trains without separate customer service personnel they need to talk directly to passengers. For example yesterday I was on a train which was delayed by trespassers. The driver will have needed to use "proceed with caution" rules, where they drive the train slowly enough that they can always stop it within the distance they can clearly see, obeying any signals, and then call their signaller back each time a signal cancels that authority, to get a new authority overriding each signal. Then, clear of the problem but much delayed, they needed to handle the fact that their dispatch turned their train into an Express to get it back where it should be, so they need to make announcements to passengers about where passengers should disembark to get a different train that's still going to their destination. Mainline train drivers make similar money to me (or at least similar to what I made five years ago) but I can't say I feel like they don't earn it. Like me their job is pretty easy when things go right, but not so much when things go wrong. Lots of people couldn't do it, and more wouldn't.
- fanf2 7y agoHere is a very informative twitter thread from a train driver explaining what is involved in learning a route https://twitter.com/chris_thedriver/status/1163792887387164672 https://twitter.com/chris_thedriver/status/11637928873871646...
- repolfx 7y agoAlso, 10 minute reboot time. And I thought Windows Update was bad! I've been on trains when they were obviously rebooting due to some sort of fault. It takes forever. What is the train doing during this time, exactly? Does every sub-computer on board boot serially or something?
- londons_explore 7y agoThere are normally a lot of self-tests involved in a reboot. Every actuator will be energised, de-energised, moved end to end to test limit switches, etc. It's mostly done serially because some things would be disrupted by other things, and figuring out a dependancy tree is tricky. Quite a lot of stuff is auto-configured in bootup. For example, it might spend 10 seconds trying to ping a debug console to see if it should enter debug mode. Or 30 seconds with IP addresses configured to the 'lab' setup before switching over to the production networking config when the lab settings won't let it connect to anything.
- repolfx 7y agoGood explanation, thanks.
- eigenvector 7y agoTo summarize: * Multiple contingencies occurred simultaneously (loss of generation from two major generators and lost of distributed generation totalling 1,400 MW) resulting in a drop in system frequency to 49.1 Hz * Standby generation (frequency response reserve) was deployed, totaling 1,000 MW or the largest single generation contingency and began to arrest the system frequency decline * Just as system frequency began to recover, a third contingency occurred resulting in the loss of a further 210 MW of generation. This caused system frequency to decline again to 48.8 Hz * Load shedding kicked in as designed and dropped 5% of load to stabilize the system The largest loss of generation was from Hornsea offshore wind farm. The wind farm should have rode through the system disturbance, but instead its control and protection systems rapidly curtailed active power generation in response to an undamped oscillation in the response of its voltage regulator through the disturbance. Basically, the internal voltage of the Hornsea wind farm collector system dropped due to the voltage regulator oscillations (from 35 kV nominal to 20 kV), while active power generation remained the same. Power = current * voltage, so an overcurrent condition occurred and protection systems operated to prevent overload of the wind turbine generators. Subsynchronous oscillations (SSO), i.e. oscillations at below power frequency (50 Hz), are a known issue in power system controls that can lead to unstable or unexpected consequences during system disturbances. The reduction in system inertia caused by the replacement of large synchronous machines with asynchronous generators as wind and solar replace conventional generators exacerbates the possibility of problematic SSO because there is less damping. Nowadays, in North America, very specific modelling is done in design stage to identify the possibility for such behaviour and ensure that if present it is adequately damped. Some system operators, such as ERCOT (Texas), require this for new wind projects. I imagine that this major occurrence will led to revisions to modelling and grid code testing standards in the UK to protect against future incidents. All in all, kudos to Ofgem, National Grid and all other participants for producing a thorough, public technical report in just about one month.
- ID1452319 7y agoWas the fact that the Hornsea site is a wind farm a contributing factor or is that merely a coincidence?
- Zenst 7y agoVery detailed info in the Appendix pdf, and wonder if some of that should of been made public - when I see grid layouts like that.
- eigenvector 7y agoAnyone with the level of engineering knowledge to do something nefarious with that information is quite capable of doing something nefarious without it. On the other hand, by releasing publicly the internal findings of the involved power companies can be scrutinized by academics, independent engineers and members of the public.
- Zenst 7y agoEqually, might be some nice deliberate errors. Sort of like a trap street upon a map https://en.wikipedia.org/wiki/Trap_street https://en.wikipedia.org/wiki/Trap_street though in this case, not for copyright protection.
- pjc50 7y agoTrying to keep a network of huge towers across the countryside secret is not going to work.
- generatorguy 7y agoThe smoking gun is the last plot in appendix D. A 2% step change in voltage results in VAR oscillation Of initially +/-100MVAR that takes 2 seconds to die out, with 13 peaks over that two seconds. This was behavior before the outage. Probably it has been like that since it was connected but nobody bothered to look. This is a problem with the smart grid, so much data is generated but nobody has time to look at any of it. Probably a good application for some kind of ml or ai. They say it required a software update to fix it which was applied the next day - probably this was just a change in the gains in the voltage controller rather than an update to the actual program or firmware. Somebody did a bad job of commissioning the voltage regulators on the wind turbines, and that is what caused a normal transmission line reclose to escalate in to such a large loss of generation. I am still curious as to why the DAR delayed action reclose time on the transmission line is 20s. I would have thought it would be more like 1-2s tops.
- eigenvector 7y agoOne of the issues in commissioning facilities as large as Hornsea is that if you want to do field validation of things like dynamic voltage regulator response (instead of just steady state performance), actually creating a sufficiently large disturbance to test it may not realistically be possible without impacting grid reliability. Hence the reliance on modelling. The presence of an underdamped SSO probably could have been identified in modelling, but there's no indication that National Grid requires SSO studies in design phase. Also I'm not sure I agree that the SSO was there all along. The system configuration appears to be several STATCOMs at the HV interconnection substation plus the VAR capabilities of the individual wind turbines. There may be an interaction between these control systems that leads to SSO under certain conditions only while being effectively damped at other times. As for the reclose time, it may have to do with circuit breaker duty cycles. We don't know what equipment they're using but if it's dated stuff, it's conceivable that it requires that level of delay before it's rated for another interrupting operation.
- radiowave 7y agoMy dad worked in power generation from the 1960s to the 90s. My recollection is that the 20 second reclose has been comon for quite a while, so there's probably a lot of systems out there that assume that's what the fault clearance procedure will be.
- generatorguy 7y agoOof. The report from the steam turbine operator is dicey. Their time stamps are relative so they don’t have GPS time synced but they are ms precision so must have a decent sequence of events record. But they don’t know why the 200MW steam turbine unit tripped, which causes a knock on trip of 400 MW of gas turbines. Report says steam turbine tripped due to a discrepancy in the speed signals. Will be interesting to see what that is! The turbine speed will be measured either by number or teeth passing by a magnetic pickup or proximity sensor per unit of time but unit of time varies so it is always a whole number of teeth, or measuring the period of the generator voltage waveform is also a nice speed signal, but maybe not if you are trying to ride through a fault in which the voltage has collapsed or is subject up to bad harmonics. Maybe harmonics caused an instantaneous over speed trip in the turbine governor? Protection relays wouldn’t be involved in measuring turbine speee and should be smart enough not to trip on overfrequency in harmonics during a fault.
- repolfx 7y agoYeah I found that part the most concerning. Basically RWE don't have any clue why they tripped even more than a month on from the event, and apparently have to wait for their next scheduled outage to make progress? That's not good. There also seem to be multiple faults at once that they don't know anything about. Turbine trip? No clue, could be bad sensors, could have been some actual physical problem in the turbine. Overpressure in the condenser? No clue, could be anything. Second generator tripped? Dunno boss. Implies that don't have enough sensor coverage and are hoping to literally eyeball something wrong when they next open it up. Also implies they can't shut down their own plant to diagnose apparent faults in anything like a reasonable timeframe? Not good. Also worth noting - Newcastle Airport were totally fine on their UPS but demanded to be considered a priority customer anyway, and that request was granted? Why? They clearly don't need to be, they have a working UPS! Honestly I'd be sending this report back for more work if I were the boss guy receiving it. It's not good. Filled with repetition, bad grammar, missing information (why did London Underground shut down, what was this 'internal traction issue') and most seriously it leaves a gaping hole around Little Barford.
- michaelt 7y ago
- alexchamberlain 7y agoI’m really quite impressed with the ESO, who is getting all the flack. They’d planned for a loss of 1GW; lost 1.9GW and had protected 95% of the network within 5 minutes. I hope everyone else realises that these networks aren’t infallible and they need to plan for very occasional outages.
- airnomad 7y agoHow would you compare grid reliability to reliability of huge networks such as Google's or Facebook's? Scale might be comparable.
- londons_explore 7y agoWhat is the purpose of these embedded generation protections: Vector Shift Protection (triggered by lightning, led to loss of 150 MW): As far as I can see, this protection shuts down generation when part of the grid might be disconnected from the rest. Shutting down when islanding hasn't occurred is wrong, and destabilises the grid. Perhaps we should be measuring islanding another way? What about applying gold coded frequency modulation to the actual system frequency? A gold code of length 1 million could be injected on just a few points on the national grid, at a power of just a few kilowatts, and be measurable from anywhere. When islanding occurred, the signal disappears, and embedded generation can switch off? Rate of change of frequency protection (led to loss of 350MW). What's the purpose of this protection at all? If frequency is changing in a downward direction, the faster it's falling, the more important it is not to disconnect supply. High positive rate of change of frequency might be a reason to disconnect generation to prevent oscillation (effectively acting as the "D" term in a pid loop), but did this occur?
- generatorguy 7y agoSignals on power lines get filtered out by transformers, line reactors, capacitors, etc. they are also expensive to inject and extract since it requires high voltage connections which have to be of the same quality as the rest of transmission system components. I’ve worked both with power line carrier for transfer trip schemes and ripple plants for controlling hot water loads. More likely your ripple plant is going to have some failure resulting in tripping all your generation when it didn’t need to. Many Important plants and transmission lines are connected by a utilities own fiber which can be used to transmit the actual state of the system instead of trying to infer it from the power waveforms. This is the best solution but obviously expensive. Uncontrolled decentralized embedded generation is not meant to ever energize a dead line. If it has a solid state power electronics interface to inject power (a fancy inverter) it is probably operating in a mode where it follows the waveform on the grid to make sure it stays in phase. If the grid waveform is poor quality, full of harmonics due to faults, or phase shifts due to major loads or generation disappearing resulting in instantly changing power flows, the inverter can’t stay in phase. It is probably a delicate balancing act to be able to follow the grid frequency but also affect it by injecting active and reactive power. I’m not an inverter guy so this is mostly speculation from reading data sheets and manuals for grid tie small battery systems. Not sure about rocof tripping generation on falling frequency. There are situations in which injecting power in to an island can result in overvoltages that would damage all of the equipment on the island, so it is better to avoid it if it looks like an island might be forming. Just a guess based on experience with an embedded steam turbine. There could have been a very short increase in frequency for the 80ms or 4-5 cycles when the single phase to ground fault occurred as faults cause machines to accelerate since it is the same as removing the load and replacing with a short circuit. Otherwise the only increase in frequency was when it started to recover by the system operator calling for more generation.
- shmageggy 7y agoThey characterize the Hornsea and Little Barford trips as to "not be expected to trip off or de-load in response to a lightning strike. This therefore appears to represent an extremely rare and unexpected event." Looking at the timeline, both of those events are logged within 1 second of the strike. To me, with even a little bit of experience with systems having complex interacting components, it seems vastly more likely that there is some unknown interaction rather than pure chance. I would imagine the prior probability of either of those two going offline is very low, so the probability of both independently going offline within one second of a potential causal event seems vanishingly small.
- generatorguy 7y agoI read it as they tripped because of the lightning strike and transmission line trip, but they shouldn’t have.
- bmsleight_ 7y agoVery interesting from engineering view and the impact to rail. Rail Headline:- Page 27. "The effects were exacerbated as the fleet was undergoing a software change which meant the train drivers could not recover trains which were operating on the new software." My view: Twenty-eight more units would have required a technician to visit if the software roll-out had been completed. Potentially exponentially increasing the disruption to public. Appendix F – Govia Thameslink Railway (GTR) technical report, Page 47-50. http://www.ofgem.gov.uk/system/files/docs/2019/09/eso_technical_report_-_appendices_-_final.pdf http://www.ofgem.gov.uk/system/files/docs/2019/09/eso_techni... Appendix F, page 49: "Therefore, the affected Class 700 and 717 sets did not react according to their design intent in these circumstances." The ability for the driver to recover was removed as part of the software update. (See, Appendix F, Cause point 8). Operators are a key stakeholder. Great technical report, would have loved to have had more information on Victoria line. Lessons can be learned from this report.
- trebligdivad 7y agoYeh, I'm guessing they were having problems with drivers doing a reset for any random thing they couldn't figure out. But shit happens, you really need a way to get out of trouble.