3 ms·
There is a lot of way to accelerate an existing line: pendulation, remove curves, add more railways along the existing line, remove stops, on a straight railway
by bdauvergne 7y ago
There is a lot of way to accelerate an existing line: pendulation, remove curves, add more railways along the existing line, remove stops, on a straight railway any train can go at more than 200km/h. As for the transfer, underground/raised metro lines from the centre to the railway station in the suburbs ? Most of the new TGV station are now done outside city centre in France (for the same reason than here, surface is expensive near city centre).
- garmaine 7y agoInfrastructure projects in America are fucked for a variety of reasons that other posters in this thread discuss. Basically each of those options end up being super expensive, subject to unending legal challenges, and exist in a regulatory environment that does NOT support changing the status quo.