We generally only hear about the failures, but it's also a tricky thing to test. Simple setups won't put load on the generator during the periodic tests, which
by toast0 7y ago
We generally only hear about the failures, but it's also a tricky thing to test. Simple setups won't put load on the generator during the periodic tests, which can result in outages if the generator will start, but can't run the load for whatever reason (ex: mechanical problems, or load size grew beyond capacity). More complicated setups may be able to switch the load to the generator, but not switch back to utility fast enough in case the generator under test fails during the test. The transfer switches themselves are prone to failures and hard to make redundant.
It seems that it's pretty hard to get this right from the beginning too, every large datacenter ends up learning this again after they have a sequence of power incidents. That said, successful switch to generator for 1 hour and then generator failure is not a terrible outcome; if there was a notification, that's enough time to evacuate critical systems (assuming you have a plan).