3 ms·
Why would your 1(a) be a problem compared to transport by ship? As i see it only requires 2 reloadings, one when entering broad gauge, and another when leaving.
by LargoLasskhyfv 7y ago
Why would your 1(a) be a problem compared to transport by ship? As i see it only requires 2 reloadings, one when entering broad gauge, and another when leaving. Both can be automated. If it needs to be, remains to be seen. According to
[1] http://en.khorgosgateway.com/sections/%D0%98%D0%BD%D1%84%D1%80%D0%B0%D1%81%D1%82%D1%80%D1%83%D0%BA%D1%82%D1%83%D1%80%D0%B0_%D1%81%D1%83%D1%85%D0%BE%D0%B3%D0%BE_%D0%BF%D0%BE%D1%80%D1%82%D0%B0 http://en.khorgosgateway.com/sections/%D0%98%D0%BD%D1%84%D1%...
this one of several "dry ports" with gauge change has the capacity of handling 18000 containers per day, which is about one modern large container ship.
Leaving the broad gauge zone isn't bottlenecked to one place
either.
Regarding the axle loads and loading gauges i can't see your point either, since almost anything broad gauge is built according to former soviet standards and their heavy needs.
It's not like the parts of track used for this are rotten since the collapse. This is all rebuilt, new, and maintained in good condition.
In the harbour town i live in which is standard gauge country, the only limitation seems to be the length of trains, which tops out at 750m/2460ft. I see 53ft containers on trains, trucks, standing here and there, though it is not common, so it stands out.
Anyways, it works? It´s just inertia, and jabbering by established parties which have interests to protect.
Nobody cares. More options in transport are a good thing.
Diversity!