3 ms·
“In 2018, we replaced 22 miles of track, reprofiled 231.6 miles of track to reduce railway noise, overhauled a critical track section near the West Oakland and
by bluejekyll 7y ago
“In 2018, we replaced 22 miles of track, reprofiled 231.6 miles of track to reduce railway noise, overhauled a critical track section near the West Oakland and 12th Street Stations, and replaced five miles of 34.5 kV electrical cable system in downtown Oakland to provide reliable power for trains. All these improvements will collectively create a more reliable, quieter, smoother and safer experience for our riders.”
https://www.bart.gov/better-bart https://www.bart.gov/better-bart