3 ms·
> The biggest pitfalls of rail have been right-of-way acquisition in mature economic regimes (high induced land values, themselves a result in large part of imp
by rayiner 7y ago
> The biggest pitfalls of rail have been right-of-way acquisition in mature economic regimes (high induced land values, themselves a result in large part of improved transport, impede further transport development), transfers and mode-transitions (especially rail-to-local endpoint travel), and technological lock-in and stagnation.
Rail is more expensive than roads in the US even where the right of way already exists. The Silver Line was built along an existing right of way and still cost $250 million per mile. (There is tons of excess freeway median in the US that could cost rail.) The problem is actually the high cost of skilled labor in the US. I don’t suppose you’d consider US labor rights to be “oppressive.”
- dredmorbius 7y agoWhich Silver Line are you referencing?
- rayiner 7y agoIn DC.
- dredmorbius 7y agoWhat are new highway construction costs per mile for equivalent daily passenger capacity? (See subsequent parallel response.)
- rayiner 7y agoIt doesn’t matter. Pretty much every place that has enough people going in the same direction to fill a rail line already has one. Meanwhile, rail outside those downtown cores is vastly underutilized. The I-270/I-495 interchange (which connects the DC Beltway to the inner suburb of Montgomery county) carries 760,000 vehicles per day, more than the entire ridership of the DC Metro, and double that of the LA Metro.
- dredmorbius 7y agoIt doesn’t matter. Oh but it does. Citations requested.
- dredmorbius 7y agoBoston's 'Big Dig" urban centre highway construction created 2 miles of roadbed at. costs of $15 - $24 billion, (up to $12 billion/mi), carrying 536,000 vehicles/day. At an average of 1.55 occupancy rating, about 830,000 passengers/day. Two miles. DC Metro's Silver Line is 29.6 miles long, has 26 stations, and cost $6.8 billion, or $229 million/mi, roughly one tenth the cost of Boston's freeway project. Peak capacity at 26 8-car trains of 120 passenger earch per hour is just under 25,000 passengers/hr. Over nearly 30 miles. Or roughly 750,000 passenger miles per hour, as compared with 70,000 passenger-miles/hr sustained for the Gig Dig. Note that, yes, I'm comparing Metro peak with Boston daily average. The >10x advantage remains. "More than 70% of rail ridership occurs during the morning and evening rush hours, and 43% of these commuters ride Metro in a one-hour time period' (WMATA Core Capacity study). This gives us about 3,200 passenger-mile/$billion for urban highway, versus 110,000 passenger-mile/$billion for DC Metro. Metro wins handily. Rail is 34x more cost effective than highway. https://www.bostonglobe.com/magazine/2015/12/29/years-later-did-big-dig-deliver/tSb8PIMS4QJUETsMpA7SpI/story.html https://www.bostonglobe.com/magazine/2015/12/29/years-later-... https://www.csmonitor.com/2003/1219/p02s01-ussc.html https://www.csmonitor.com/2003/1219/p02s01-ussc.html https://nhts.ornl.gov/tables09/fatcat/2009/avo_TRPTRANS_WHYTRP1S.html https://nhts.ornl.gov/tables09/fatcat/2009/avo_TRPTRANS_WHYT... https://en.wikipedia.org/wiki/Silver_Line_(Washington_Metro) https://en.wikipedia.org/wiki/Silver_Line_(Washington_Metro) https://web.archive.org/web/20101203024521/http://wmata.com/pdfs/planning/CoreCapacity_ExecSum.pdf https://web.archive.org/web/20101203024521/http://wmata.com/...
- rayiner 7y agoOn the cost side, you’re comparing apples and oranges: building through downtown Boston in a tunnel compared to building through exurban Virginia above ground on an existing right of way. A better point of comparison to the Silver Line is the inter-county connector in MD. Both built in the 2010s. $127 million per mile, which includes land acquisition costs because it wasn’t built along an existing right of way like the Silver Line. You’re also completely off on the ridership side. Because rail only takes you on inflexible routes, actual ridership is low except in dense downtown cores. The Silver Line operates nowhere near capacity. Silver Line ridership is under 17,000 passengers per day. The inter county connector averages 30-40,000. So more than double the ridership for half the per mile cost.