3 ms·
Probably the track they laid would have needed to meet only the most basic requirements, with minimal consideration of reliability, safety, longevity, etc.
by jl6 7y ago
Probably the track they laid would have needed to meet only the most basic requirements, with minimal consideration of reliability, safety, longevity, etc.