4 ms·
Survey control is transferred down the tunnel from surface. How it gets down there depends on whether you launch from a shaft or pit, but once survey control is
by abduhl 7y ago
Survey control is transferred down the tunnel from surface. How it gets down there depends on whether you launch from a shaft or pit, but once survey control is established in the hole it is straight forward to locate the TBM using standard survey techniques (eg - survey prisms). The TBM has a reflector that can be shot with a survey instrument to accurately place the machine head and the TBM itself is equipped with gyroscopic or accelerometers for backup control if survey is lost during mining.