3 ms·
I think you’re off by a factor of ten. Sunlight is about 1 kW/m^2, so 1 km^2 (=1e6 m^2) would only be 1000 MW at 100% efficiency, 100-200 MW at 10-20%. That sai
by ben_w 7y ago
I think you’re off by a factor of ten. Sunlight is about 1 kW/m^2, so 1 km^2 (=1e6 m^2) would only be 1000 MW at 100% efficiency, 100-200 MW at 10-20%. That said, the plant looks bigger than 1 km^2 to me.
- celrod 7y agoThe wikipedia link shared above by aunty_helen ( https://en.wikipedia.org/wiki/Pavagada_Solar_Park https://en.wikipedia.org/wiki/Pavagada_Solar_Park ), which matches the name in the google maps link, says 53 km^2. It also says that it could produce 600MW by the end of January 2018, can produce 1400MW now, with 650MW more under construction. It also says 2000MW capacity being planned for by the end of 2019. I'm not sure how much of the 53 km has active solar panels, but they'd only need 3.8% efficiency to hit 2000MW with that much area.
- ben_w 7y agoThanks, I didn’t see the link earlier. I’m glad to see it’s the array which is bigger than estimated. :)