But what about training and processes? The tech part is easy, relatively speaking. The hard part is each plant can have hundreds of workers whose entire jobs
by crazygringo 7y ago
But what about training and processes?
The tech part is easy, relatively speaking.
The hard part is each plant can have hundreds of workers whose entire jobs depend on the way things are set up. It can be hugely expensive, time-consuming and disrupting for months to try to replace processes with new ones, particularly if you expect things to continue running without interruption. It's one of those rebuild-the-airplane-while-flying-it situations.
Maybe this was a uniquely lucky situation, because it doesn't sound like a generalizable magic-bullet to me.
- treis 7y agoIt would definitely be interesting to hear the other side of this anecdote. My guess is that there's a lot of workarounds happening at the plant level that are being hidden.
- JoeAltmaier 7y agoThe plant now tracks each individual product, line, customer, contract in realtime with complete transparency to the parent company. They swipe barcodes and use online tools. Their processes were streamlined and paper removed. It wasn't painless for everybody. In each region some good ol boy would resign the week before changeover. When they'd come in to do inventory some room or shed would be locked and nobody would have the key. They'd break the lock and whattaya know, the room would be empty. Supposed to be full of inventory.
- treis 7y ago>The plant now tracks each individual product, line, customer, contract in realtime with complete transparency to the parent company. I'm sure that's what the parent company thinks is happening. Whether that's what actually is happening at the plant level is another question. So is whether the improvement came with a hit to productivity or any other hidden cost. Obviously I know nothing specific about the company but speaking generally I've seen a lot of work arounds and inefficiencies in my day.
- JoeAltmaier 7y agoYes, every single item on every single line is tracked. Nothing (can) get sold without being in the system. Doubters abound. Even now a decade later, folks meet this story with disbelief and doubt.
- treis 7y ago>Yes, every single item on every single line is tracked. Nothing (can) get sold without being in the system. Worker: "Steve from Acme Co. needs a doohickey with a widget today but we don't have a SKU for that" Boss: "Corporate takes 2 days to issue SKUs so just mark it as a doohickey and charge him 10% more for the widget" Or maybe the customer has to go somewhere else because their turn around time can't be met. >Doubters abound. Even now a decade later, folks meet this story with disbelief and doubt. Because it's not our first time at the rodeo. If massive IT projects were this easy we'd all be doing it like that. They're generally not. Steam rolling the end user may have worked this time but other times it's ground the business to a halt because those individual plant level differences were there for a reason.
- JoeAltmaier 7y agoThey're massive because they're made to be that way. Technology transition takes will and backbone. If that's missing, there's where $25M gets spent down the drain. I agree they generally don't go well. Because they're run by weak Directors and VPs who are 2nd-guessing IT and getting in the way. Plant differences are all well and good. But so is "IT not collapsing under 20 years of cruft". It costs something to bring all the plants in line. But it also profits e.g. they're still in business after 10 years. Here's how the money part went. Once the tracking went online, they realized (region by region) they were losing $1M per month. 2nd month: losing $0.5M. Third month: break even. 4th month: 1M in the green. Why? Because they now knew (for the first time) what the hell they were selling, how much to whom, and for what price. The VPs quickly became totally addicting to this instant-knowledge web API and used it to turn the business around.
- vajrabum 7y ago
- JoeAltmaier 7y agoThey had all those problems, and solved them by being prepared. Training happened before changeover with a separate team moving from region to region. Because something is difficult doesn't mean it is impossible, or shouldn't be done. The critical part is deciding you are going to do it, and not go back.