3 ms·
Assuming QC == quality control, I find that attitude highly ironic. Measure twice, cut once. Take the time to write carefully up front and proofread, before yo
by sixstringtheory 7y ago
Assuming QC == quality control, I find that attitude highly ironic.
Measure twice, cut once. Take the time to write carefully up front and proofread, before you submit it to a lengthy process.
- inflatableDodo 7y agoI think a lot of people doing the drawings are either dyslexic, or maybe just do not care. Also, engineering companies don't tend to have proofreaders. I can proofread, but learned quickly that I should not bother proofreading the drawings that came through. All it ever achieved was a torrent of abuse, combined with a flat refusal to even think about getting a new drawing issued.