8 ms·
The load factor is part of the spec, usually (I didn't check the specs). Maybe blatant misuse is a little bit strong, but one could get that SpaceX took slightl
by hef19898 8y ago
The load factor is part of the spec, usually (I didn't check the specs). Maybe blatant misuse is a little bit strong, but one could get that SpaceX took slightly higher risks than traditional companies.