5 ms·
Rail lines can take a certain amount per hour (say 32 on the Victoria line). They are already maximum length and maximum capacity, and already leave people behi
by isostatic 7y ago
Rail lines can take a certain amount per hour (say 32 on the Victoria line). They are already maximum length and maximum capacity, and already leave people behind.
Buses are cheaper but slower. Those who aren’t in as much of a hurry can take the bus or walk.
With no cost differential people will base it just on time, increasing time taken on the rail service.
Same applys on long distance. Sometimes I need to be in London at 9am so will take a more expensive busier peak train. Sometimes I don’t need to be there until the afternoon so I travel on quieter or slower trains, saving money and freeing space for those who do have to be in by 9am.
- CaptainZapp 7y agoRapid Bus Transit[1] systems seem to be a good way to combine high capacity with (almost) guaranteed transit times and much lower costs than building rail, let alone subway systems. [1] https://en.wikipedia.org/wiki/Bus_rapid_transit https://en.wikipedia.org/wiki/Bus_rapid_transit
- tty2300 7y agoAdd more tracks. We have 8 lane highways but a 4 track train line is unthinkable?
- luckylion 7y agoThat might work in the US but it won't in Europe where cities are generally densely packed. You can't just tear down a few rows of houses/dig new tunnles/turn the city into one big construction project to add more space for tracks.
- isostatic 7y agoThat's what we're doing with the WCML. Adding two new tracks to the existing 4. Obviously they can't go through the middle of towns - demolishing that many buildings would be unthinkable even without the cost, so they bypass the towns they don't serve (currently half the high speed trains run non stop through places like Harrow, Watford, Hemel, Bletchly and Milton Keynes) Building new tracks (and indeed building new highways), even in the countryside where land is cheap, is very expensive and has massive amounts of opposition. In London, crossrail is adding two new underground tracks to the central line. It's running years behind schedule and costs billions. And underground is crowded too -- there's one point on crossrail where they had a 30cm margin of error between existing tunnels. Free public transport in London would cost £5b a year. This would mean those who travel a lot on expensive services (like city workers on the tube) will be being subsidised by those who don't travel (like people who walk to work in the local school).