4 ms·
I'm serious. If the final backup system is to revert to mechanical cranks, pulleys, and cables to move the horizontal stabilizer, then the pilots have to be abl
by Merrill 7y ago
I'm serious. If the final backup system is to revert to mechanical cranks, pulleys, and cables to move the horizontal stabilizer, then the pilots have to be able to exert sufficient torque and power on the control wheels to do so.