3 ms·
> There are lots of highly trained operators working 4 shifts. There are complex regulations, and safety upgrades after 9/11 and Fukushima. Comment of mine abo
by Gibbon1 8y ago
> There are lots of highly trained operators working 4 shifts. There are complex regulations, and safety upgrades after 9/11 and Fukushima.
Comment of mine about utility scale solar. Those plants don't require a lot of specialized skills to keep running. And they're fundamentally redundant. There aren't oopies that take them offline for 18 months.
- TeMPOraL 8y agoThey also don't work for base load unless backed by energy storage tech that doesn't really exist yet.
- Gibbon1 8y agoA lot of base load demand is driven by industrial customers balance sheet economics tho. They use power at night because it's subsidized by peek demand. For instance my dad managed wind tunnels. They typically ran in the late evening at the whim of the power companies schedule. Because that's when PG&E had the extra capacity. Otherwise there was no technical reason they needed to run at night. So if the pricing structure for electricity means power is very expensive at night, a lot of current customers will just switch. Which will reduce the demand. In this case economics 101 gives the right answer.
- TeMPOraL 8y agoFrom what I understand, this is still scheduling in blocks of hours. One problem with solar & wind is that their variability happens on the scale of minutes. If you use them for base load, you'll be randomly losing or gaining large amounts of power output - much faster than industrial loads could switch. It would be unrealistic to try and plan around it, and supply/demand won't help here - even if you're selling sudden solar surplus at negative prices, there won't be enough buyers ready. For this to work, we need much more energy storage. Then there're seasonal variation; the industry your dad worked in probably wouldn't be happy if they were told they can't run wind tunnels in winter because there isn't enough power in the grid.