3 ms·
Partially, yes. This is the drive behind the "28 by 28" initiative at LA Metro, where the goal is to complete 28 pre-planned projects before the games. (The ori
by gamblor956 8y ago
Partially, yes. This is the drive behind the "28 by 28" initiative at LA Metro, where the goal is to complete 28 pre-planned projects before the games. (The original plan, sans Olympics, was to complete about 5-6 of them.)
These projects include the Subway to UCLA, the LAX People Mover and Metro connector, the "Regional Connector" downtown, the extension of the Gold Line in the San Gabriel Valley, hundreds of miles of bike lanes, and various freeway upgrades. (See https://en.wikipedia.org/wiki/Twenty-eight_by_%2728 https://en.wikipedia.org/wiki/Twenty-eight_by_%2728)