If the gross fusion power output of ITER were converted to electricity at 40% efficiency, and you ignored the power needed to run the reactor, and also ignored
by pfdietz 8y ago
If the gross fusion power output of ITER were converted to electricity at 40% efficiency, and you ignored the power needed to run the reactor, and also ignored the cost of the breeding blanket, turbines, and generators (which ITER doesn't have) then the capital cost would be about $100/W(e).
In contrast, the cost of installed utility scale PV is around $1/W.