3 ms·
Maybe I'm just a grump, but: 5% is pretty low number for training people up. Perhaps that's just the "hit the books on your own, but during work time" portion?
by anarazel 8y ago
Maybe I'm just a grump, but: 5% is pretty low number for training people up. Perhaps that's just the "hit the books on your own, but during work time" portion? If it includes other things (talking people though a project that's on the edge of their capabilities, discussing the architecture of important project from an educational perspective, ...) then it seems pretty low.
EDIT: non-phone spelling
- EliRivers 8y agoIt is, I believe from talking to others and my own experience, significantly higher than the average (outside the mystical FAANG etc). The average is basically zero. Talking people through things at the edge of their capabilities and discussing the architecture etc that they need to know; that's just doing the actual job, surely.
- maxxxxx 8y ago5% is pretty low to basically nothing. I agree.
- ikeyany 8y ago5% = 2 hours out of the entire week It's basically 4 conversations and that's it.