3 ms·
South Australia has rolling blackouts in the summers when the coal "peaker plants" come online, and it takes 30-45 minutes in some cases for them to come online
by SEJeff 8y ago
South Australia has rolling blackouts in the summers when the coal "peaker plants" come online, and it takes 30-45 minutes in some cases for them to come online during a surge in demand due to blackouts. The government turned to Tesla to install (at the time) the biggest industrial battery in the world at 100MW / 129MWh and it is really working. Here is some info on it with some details (electrek is a Tesla fanboi site, but the reporting is accurate):
https://electrek.co/2018/09/24/tesla-powerpack-battery-australia-cost-revenue/ https://electrek.co/2018/09/24/tesla-powerpack-battery-austr...
- SEJeff 8y agoNot really sure why something that adds context to the conversation is downvoted.