3 ms·
If the alternative is one engineer spending 50% of their time dealing with infrastructure, $5000 is still a good deal.
by ryanbrunner 8y ago
If the alternative is one engineer spending 50% of their time dealing with infrastructure, $5000 is still a good deal.