4 ms·
The track itself isn't the expensive bit. It's simply steel, concrete and gravel, and probably could cost <100k per mile. It's the compulsory land purchases a
by londons_explore 8y ago
The track itself isn't the expensive bit. It's simply steel, concrete and gravel, and probably could cost <100k per mile.
It's the compulsory land purchases and expensive consultants which are the main expense.
- dx034 8y agoTrack for high speed trains can be very expensive. Unless land is very flat, it's not uncommon for >50% of track to be on bridges/in tunnels.
- taobility 8y agohttps://en.wikipedia.org/wiki/Beijing–Shanghai_high-speed_railway https://en.wikipedia.org/wiki/Beijing–Shanghai_high-speed_ra... The HSR between Beijing and Shanghai has 87% length are elevated.