Those weren't designed "from scratch", start-to-finish, with no testing or prototyping along the way. The Wright Brothers developed a wind tunnel and many model
by Jtsummers 8y ago
Those weren't designed "from scratch", start-to-finish, with no testing or prototyping along the way.
The Wright Brothers developed a wind tunnel and many models on their way to first flight. Same concept for getting to the moon.
Those large scale projects were not done in a Waterfall fashion, they were done iteratively with models/simulations/prototypes produced along the way.
- igouy 8y ago> done iteratively with models/simulations/prototypes models/simulations/prototypes != iteratively
- Jtsummers 8y agoThey’re key components of the iterative process.
- igouy 8y agoThey're key components of BDUF — "Figure 7. Step 3: Attempt to do the job twice - the first result provides an early simulation of the final product." http://www-scf.usc.edu/~csci201/lectures/Lecture11/royce1970.pdf http://www-scf.usc.edu/~csci201/lectures/Lecture11/royce1970...